ASSESSMENT OF COSTS IN CUT-OFF GRADES OPTIMIZATION BY USING GRID SEARCH METHOD

dc.contributor.authorCetin, Erhan
dc.date.accessioned2024-04-24T17:18:52Z
dc.date.available2024-04-24T17:18:52Z
dc.date.issued2018
dc.departmentDicle Üniversitesien_US
dc.description.abstractThe optimization of cut-off grades is a fundamental issue for metallic ore deposits. The cut-off grade is used to classify the material as ore or waste. Due to the time value of money, in order to achieve the maximum net present value, an optimum schedules of cut-off grades must be used. The depletion rate is the rate of depletion of a mineral deposit. Variable mining costs are to be applied to the really excavated material, as some of the depletion can be left in-situ. Due to access constraints, some of the blocks that have an average grade less than the determined cut-off grade are left in-situ, some of them are excavated and dumped as waste material. Naturally, variable mining costs should be applied to the blocks of a mineral deposit that are actually excavated. The probability density function of an exponential distribution is used to find the portion of the depletion rate over the production rate that is to be left in-situ. As a result, inverse probability densitv function is to be applied as the portion of the depletion rate over the production rate that is to be excavated and dumped. The parts of a mineral deposit that are excavated but w ill be dumped as waste material incur some additional cost of rehabilitation that is to be included in the algorithm of the cut-off grades optimization. This paper describes the general problem of cut-off grades optimization and outlines the further extension of the method including various depletion rates and variable rehabilitation cost. The author introduces the general background of the use of grid search in cut-off grades optimization by using various depletion rates and variable rehabilitation cost. The software developed in this subject is checked by means of a case study.en_US
dc.identifier.doi10.24425/118650
dc.identifier.endpage80en_US
dc.identifier.issn0860-0953
dc.identifier.issn2299-2324
dc.identifier.issue2en_US
dc.identifier.scopus2-s2.0-85049169940
dc.identifier.scopusqualityQ2
dc.identifier.startpage67en_US
dc.identifier.urihttps://doi.org/10.24425/118650
dc.identifier.urihttps://hdl.handle.net/11468/18934
dc.identifier.volume34en_US
dc.identifier.wosWOS:000437211000005
dc.identifier.wosqualityQ4
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoenen_US
dc.publisherPolska Akad Nauk, Polish Acad Sciences, Miner & Energy Econ Res Inst Pasen_US
dc.relation.ispartofGospodarka Surowcami Mineralnymi-Mineral Resources Management
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectCut-Off Gradesen_US
dc.subjectOptimizationen_US
dc.subjectGrid Searchen_US
dc.subjectRehabilitation Costen_US
dc.subjectDepletion Rateen_US
dc.titleASSESSMENT OF COSTS IN CUT-OFF GRADES OPTIMIZATION BY USING GRID SEARCH METHODen_US
dc.titleASSESSMENT OF COSTS IN CUT-OFF GRADES OPTIMIZATION BY USING GRID SEARCH METHOD
dc.typeArticleen_US

Dosyalar